|
[1] Dar-Li
Yang and Maw-Sheng Chern (1995). A two-machine flowshop sequencing
problem with limited waiting time constraints. Computers and
Industrial Engineering 28, 63-70 (SCI).
[2] Maw-Sheng
Chern and Dar-Li Yang (1995). A branch-and-bound algorithm for the
two-machine sequencing problem with reprocessing operations.
Journal of the Chinese Institute of Industrial Engineers 12,
55-61 (EI).
[3] Dar-Li
Yang and Maw-Sheng Chern (1997). A scheduling problem with
reprocessing operations - a case study. Journal of Management
14, 135-154 (TSSCI).
[4] Dar-Li
Yang, Maw-Sheng Chern and Jung-Te Wang (1998). A two-machine
multi-family flowshop batch processing scheduling problem with the
total completion time case. International Journal of Operations
and Quantitative Management 4, 315-325.
[5] Dar-Li
Yang and Maw-Sheng Chern (1999). A generalized two-machine flowshop
scheduling problem with processing time linearly dependent on job
waiting-time. Computers and Industrial Engineering 36,
365-378 (SCI).
[6] Dar-Li
Yang and Maw-Sheng Chern (2000). Two-machine flowshop group
scheduling problem. Computers and Operations Research 27,
975-985 (SCI).
[7] Maw-Sheng
Chern, Dar-Li Yang and Jung-Te Wang (2001). A two-stage
multi-family flowshop scheduling problem with two batch processors.
Journal of the Chinese Institute of Industrial Engineers 18,
No.3, 77-85 (EI).
[8] Dar-Li Yang, Maw-Sheng Chern and
Jung-Te Wang (2001). A two-machine multi-family flowshop scheduling
problem with batch processing. International Journal of
Industrial Engineering 8, No.4, 289-298 (SCI).
[9] Dar-Li Yang, Ching-Lien Hung,
Chou-Jung Hsu and Maw-Sheng Chern (2002). Minimizing the makespan
in a single machine scheduling problem with a flexible maintenance.
Journal of the Chinese Institute of
Industrial Engineers 19,
No.1, 63-66 (EI).
[10] Chih-Hsiung Wang, Dar-Li Yang,
Tai-Hsi Wu, Wen-Hung Kuo and Neng-Hui Shih (2004). Impact of
inspection errors on the lot size problem.
Journal of Information and
Optimization Science 25, No.2, 331-348 (EI).
[11]
Wen-Hung Kuo
and Dar-Li Yang (2006). Single-machine group scheduling with a
time-dependent learning effect. Computers
and Operations
Research 33, No.8, 2099-2112 (SCI).
[12] Wen-Hung
Kuo and Dar-Li Yang (2006). Minimizing the total completion time in
a single machine scheduling problem with a time-dependent learning
effect. European Journal of
Operational Research 174, No.2, 1184-1190
(SCI).
[13]
Wen-Hung Kuo and Dar-Li Yang (2006).
Minimizing the makespan in a
single machine scheduling problem with a time-based learning effect.
Information Processing Letters 97, No.2,
64-67 (SCI).
[14]
Chou-Jung Hsu, Wen-Hung Kuo, Dar-Li Yang and Maw-Sheng Chern (2006).
Minmizing the makespan in a two-stage flowshop scheduling problem
with a function constraint on alternative machines.
Journal
of Marine Science and Technology 14, No.4, 213-217
(SCI).
[15]
Wen-Hung Kuo and Dar-Li Yang (2007).
Single machine scheduling with past-sequence-dependent setup
times and learning effects. Information Processing Letters
102, No.1, 22-26 (SCI).
[16] Wen-Hung
Kuo and Dar-Li Yang (2007).
Single-machine scheduling problems with start-time dependent
processing time. Computers and Mathematics with Applications
53, No.11, 1658-1664
(SCI).
[17]
Wen-Hung Kuo and Dar-Li Yang (2007).
Single-machine scheduling problems with the time-dependent
learning effect. Computers and Mathematics with Applications
53, No.11, 1733-1739
(SCI).
[18]
Dar-Li Yang
and Wen-Hung Kuo (2007).
Single-machine scheduling with an actual time-dependent learning
effect. Journal of the Operational Research Society 58, 1348
- 1353 (SSCI).
[19]
Dar-Li Yang,
Chou-Jung Hsu and Wen-Hung Kuo
(2008).
A two-machine flowshop
scheduling problem with a separated maintenance constraint.
Computers
and
Operations Research
35, No.3, 876-883 (SCI).
[20]
Dar-Li Yang, Wen-Hung Kuo
and
Maw-Sheng
Chern
(2008).
Multi-family scheduling in a
two-machine reentrant flow shop with setups.
European Journal of
Operational Research
187, No.3, 1160-1170
(SCI).
[21]
Wen-Hung Kuo and Dar-Li
Yang (2008).
Minimizing the makespan in a single-machine scheduling
problem with the cyclic process of an aging effect. Journal of
the Operational Research Society 59, 416-420 (SSCI).
[22]
Wen-Hung Kuo and Dar-Li
Yang (2008).
A note on due-date assignment and single machine scheduling
with deteriorating jobs. Journal of the Operational Research
Society 59, 857- 859 (SSCI).
[23]
Wen-Hung Kuo and Dar-Li
Yang (2008).
Parallel machine scheduling with
time dependent processing times.
Theoretical Computer Science 393, Issues 1-3, 204-210 (SCI).
[24]
Wen-Hung Kuo,
Chou-Jung Hsu and Dar-Li Yang
(2009).
A note on unrelated parallel machine scheduling with time dependent
processing times. Journal of the Operational Research Society
60, 431- 434 (SSCI).
[25]
Ling-Huey Su, Dar-Li Yang and
Hou-Kuan Chou (2009). A two-stage flowshop scheduling with limited
buffer storage. Asia-Pacific Journal of Operations Research
26, 503-522 (SCI).
[26]
Dar-Li Yang
and Wen-Hung Kuo
(2009). A
single-machine scheduling problem with learning effects in
intermittent batch production. Computers
and
Industrial
Engineering 57, 762-765 (SCI).
[27]
Dar-Li Yang
and Wen-Hung Kuo
(2009). Single-machine scheduling with both deterioration and
learning effects. Annals of Operations Research 172, 315-327
(SCI).
[28]
Dar-Li Yang
and Wen-Hung Kuo
(2010). Some
scheduling problems with deteriorating jobs and learning effects.
Computers
and
Industrial
Engineering 58, 25-28 (SCI).
[29]
Wen-Hung Kuo and
Dar-Li Yang
(2010).
Viewpoint on Single-machine with a
sum-of-actual-processing-time-based learning effect. Journal of
the Operational Research Society 61, 352-355
(SSCI).
[30]
Suh-Jenq Yang, Dar-Li Yang and T.C.E.
Cheng (2010). Single-machine due-window assignment and scheduling
with job-dependent aging effects and deteriorating maintenance.
Computers
and
Operations Research
37, 1510-1514 (SCI).
[31]
Wen-Hung Kuo and
Dar-Li Yang
(2010). Erratum on machine scheduling with
a general learning effect. Mathematical and Computer Modelling
51, 847-849 (SCI).
[32]
Suh-Jenq Yang and Dar-Li Yang (2010).
Minimizing the makespan on single-machine scheduling with aging
effect and variable maintenance activities. Omega 38, 528-533
(SSCI).
[33]
Suh-Jenq Yang and Dar-Li Yang (2010).
Single-machine group scheduling problems under the effects of
deterioration and learning. Computers and Industrial Engineering
58, 754-758 (SCI).
[34]
Suh-Jenq Yang, Chou-Jung Hsu and
Dar-Li Yang (2010). Single-machine scheduling with due-date
assignment and aging effect under a deteriorating maintenance
activity consideration. International Journal of Information and
Management Sciences 21, 177-195 (EI).
[35]
Wen-Hung Kuo
and Dar-Li Yang
(2010). Note on "Single-machine and flowshop scheduling with a
general learning effect model" and "Some single-machine and
m-machine flowshop scheduling problems with learning
considerations". Information Sciences 180, 3814-3816 (SCI).
[36]
Suh-Jenq Yang, Chou-Jung Hsu and
Dar-Li Yang (2010). Parallel-machine scheduling with setup and
removal times under consideration of the learning effect. Journal
of the Chinese Institute of Industrial Engineers 27, 372-378
(EI).
[37] Suh-Jenq
Yang and Dar-Li Yang (2010). Minimizing total completion time in
single-machine scheduling with aging/deteriorating effects and
deteriorating maintenance activities. Computers and Mathematics
with Applications
60, 2161-2169
(SCI).
[38] Suh-Jenq
Yang and Dar-Li Yang (2010). Note on "A note on single-machine group
scheduling problems with position-based learning effect". Applied
Mathematical Modelling 34, 4306-4308 (SCI).
[39] Suh-Jenq
Yang and Dar-Li Yang (2010). Single-machine scheduling problems with
aging effect under an optional maintenance activity consideration.
INFOR 48, 171-179 (SCI).
[40]
Wen-Hung Kuo and
Dar-Li Yang
(2011). A note on due date assignment and
single-machine scheduling with deteriorating jobs and learning
effects. Journal of the Operational Research Society 62,
206-210 (SSCI).
[41] Chou-Jung Hsu,
Suh-Jenq Yang and Dar-Li Yang (2011).
Due-date assignment and optional maintenance activity scheduling
problem with linear deteriorating jobs.
Journal of
Marine Science and Technology 19, 97-100 (SCI).
[42] Chou-Jung
Hsu,
Wen-Hung Kuo
and Dar-Li Yang (2011). Unrelated parallel machine scheduling with
past-sequence-dependent setup time and learning effects. Applied
Mathematical Modelling 35, 1492-1496 (SCI).
[43] Suh-Jenq
Yang and Dar-Li Yang (2011). Single-machine scheduling simultaneous
with position-based and sum-of-processing-times-based learning
considerations under group technology assumption. Applied
Mathematical Modelling 35, 2068-2074 (SCI).
[44] Ji-Bo
Wang, Dar-Li Yang and Chou-Jung Hsu (2011). Single-machine
scheduling to minimize absolute value in maximum lateness with
deteriorating jobs. Advanced Materials Research 201-203,
1054-1060 (EI).
[45]
T.C.E. Cheng, Chou-Jung Hsu and
Dar-Li Yang (2011). Unrelated parallel-machine scheduling with
deteriorating maintenance activities. Computers and Industrial
Engineering 60, 602-605 (SCI).
[46]
Suh-Jenq Yang, Chou-Jung Hsu,
Teng-Ruey Chang and Dar-Li Yang (2011). Single-machine scheduling
with past-sequence-dependent delivery times and learning effect.
Journal of the Chinese Institute of Industrial Engineers 28,
247-255 (EI).
[47] Chou-Jung
Hsu, Suh-Jenq Yang and Dar-Li Yang (2011). Two due date assignment
problems with position-dependent processing time on a
single-machine. Computers and Industrial Engineering 60,
796-800 (SCI).
[48]
Wen-Hung Kuo,
Chou-Jung Hsu and Dar-Li Yang (2011). Some unrelated parallel
machine scheduling problems with past-sequence-dependent setup time
and learning effects. Computers and Industrial Engineering
61, 179-183 (SCI).
[49] Chuan-Li
Zhao, Chou-Jung Hsu and Dar-Li Yang (2011). Considerations of
single-machine scheduling with deteriorating jobs. Applied
Mathematical Modelling 35, 5134-5142 (SCI).
[50]
Chou-Jung Hsu, T.C.E. Cheng and
Dar-Li Yang (2011).
Unrelated
parallel-machine scheduling with rate-modifying activities to
minimize the total completion time. Information Sciences
181, 4799-4803 (SCI).
[51]
Dar-Li Yang
and Wen-Hung Kuo (2011).
Scheduling with deteriorating jobs and learning effects.
Applied Mathematics and Computation
218,
2069-2073 (SCI).
[52] Suh-Jenq
Yang and Dar-Li Yang (2012). Single-machine scheduling problems
simultaneous with deteriorating and learning effects under a
deteriorating maintenance consideration. A chapter in the book “Just-in-Time
Systems” Roger Z. Ríos-Mercado and Yasmín A. Ríos-Solís,
editors. Volume 60 of Series on Optimization and Its Applications.
Springer, 1st edition.
[53]
Wen-Hung Kuo and
Dar-Li Yang
(2012). Single-machine scheduling with
deteriorating jobs. International Journal of Systems Science
43, 132-139 (SCI).
[54] T.C.E.
Cheng, Suh-Jenq Yang and Dar-Li Yang (2012) Common due-window
assignment and scheduling of linear time-dependent deteriorating
jobs and a deteriorating maintenance activity. International
Journal of Production Economics 135, 154-161 (SCI).
[55] Suh-Jenq
Yang, Chou-Jung Hsu and Dar-Li Yang (2011). Single-machine
scheduling and slack due-date assignment with aging effect and
deteriorating maintenance. Optimization Letters (Accepted)
(SCI).
[56] Wen-Hung
Kuo, Chou-Jung Hsu and Dar-Li Yang (2011). Worst-case and numerical
analysis of heuristic algorithms for flowshop scheduling problems
with a time-dependent leaning effect. Information Sciences
(Accepted) (SCI).
[57]
Dar-Li Yang, T.C.E. Cheng,
Suh-Jenq Yang
and Chou-Jung Hsu (2011).
Unrelated
parallel-machine scheduling with aging effects and multi-maintenance
activities. Computers
and
Operations Research
(Accepted)
(SCI).
[58]
Min Ji,
Chou-Jung Hsu and Dar-Li Yang
(2011).
Single-machine
scheduling with deteriorating jobs and aging effects under an
optional maintenance activity consideration. Journal of
Combinatorial Optimization
(Accepted) (SCI).
[59] Suh-Jenq
Yang and Dar-Li Yang (2011). Single-machine scheduling problems with
past-sequence-dependent delivery times and position-dependent
processing times. Journal of the Operational Research Society
(Accepted) (SSCI).
[60]
Suh-Jenq Yang, Dar-Li Yang and
Teng-Ruey Chang (2011). Single-machine scheduling with joint
deterioration and learning effects under group technology and group
availability assumptions. Journal of the Chinese Institute of
Industrial Engineers
(Accepted) (EI).
[61]
Suh-Jenq Yang,
Chou-Jung Hsu and Dar-Li Yang (2011). Note on "Unrelated
parallel-machine scheduling with deteriorating maintenance
activities". Computers and Industrial Engineering (Accepted)
(SCI).
[62] Wen-Hung
Kuo and Dar-Li Yang (2012). A short note on "Proportionate flowshops
with general position-dependent processing times". Information
Processing Letters (Accepted) (SCI).
[63] Suh-Jenq
Yang and Dar-Li Yang (2012). Note on "A unique integer mathematical
model for scheduling deteriorating jobs with rate-modifying
activities on a single machine". International Journal of
Advanced Manufacturing Technology (Accepted) (SCI).
[64] Dar-Li Yang, Hsin-Tao Lee and
Suh-Jenq Yang (2012).
Unrelated parallel-machine scheduling simultaneously with
rate-modifying activities and earliness and tardiness penalties.
Journal of the Chinese Institute of Industrial Engineers
(Accepted) (EI).
[65] Ji-Bo
Wang, Chou-Jung Hsu and Dar-Li Yang (2012). Single-machine
scheduling with effects of exponential learning and general
deterioration. Applied Mathematical Modelling (Accepted)
(SCI).
[66]
Hsin-Tao Lee, Dar-Li Yang and
Suh-Jenq Yang
(2012). Multi-machine scheduling with deterioration effects and
maintenance activities for minimizing the total earliness and
tardiness costs. International Journal of Advanced Manufacturing
Technology (Accepted) (SCI).
[67] T.C.E.
Cheng, Wen-Hung Kuo and
Dar-Li Yang (2012). Scheduling with a position-weighted learning
effect based on sum-of-logarithm-processing-times and job position.
Information
Sciences
(Accepted) (SCI).
[68] Chou-Jung Hsu and Dar-Li Yang (2012). Unrelated
parallel-machine scheduling with position-dependent deteriorating
jobs and resource-dependent processing time. Optimization Letters
(Accepted) (SCI).
[69] T.C.E. Cheng, Wen-Hung Kuo and Dar-Li Yang (2012). Scheduling
with a position-weighted learning effect. Optimization Letters
(Accepted) (SCI).
[70] Dar-Li Yang, T.C.E. Cheng and Wen-Hung Kuo (2012).
Scheduling with a general learning effect.
International Journal of
Advanced Manufacturing Technology (Accepted) (SCI).
[71]
Dar-Li Yang and Suh-Jenq Yang
(2013). Unrelated parallel-machine scheduling problems with multiple
rate-modifying activities. Information Sciences (Accepted) (SCI).
[72] Suh-Jenq
Yang, Jia-Yuarn Guo, Hsin-Tao Lee and Dar-Li Yang
(2013). Single-machine scheduling problems with
past-sequence-dependent delivery times and deterioration and
learning effects simultaneously. International Journal of
Innovative Computing Information and Control (Accepted)
(SCI).
[73] Dehua Xu, Aihua Liu and Dar-Li Yang (2013).
Mathematical programming models for competitive two-agent
single-machine scheduling with flexible periodic maintenance
activities. The Arabian Journal for Science and
Engineering (Accepted) (SCI).
[74] Dehua Xu and Dar-Li Yang (2013). Makespan minimization
for two parallel machines scheduling with a periodic
availability constraint: Mathematical programming model,
average-case analysis, and anomalies. Applied
Mathematical Modelling (Accepted) (SCI).
[75] Dar-Li Yang, T.C.E. Cheng and Suh-Jenq
Yang (2013). Parallel-machine scheduling with controllable processing times
and rate-modifying activities to minimize total cost
involving total completion time and job compressions.
International Journal of Production Research (Accepted) (SCI).
[76]
Chou-Jung Hsu, Min Ji, Jia-Yuarn Guo and Dar-Li Yang
(2013). Unrelated parallel-machine scheduling problems with aging effects
and deteriorating maintenance activities . Information Sciences (Accepted) (SCI).
[77]
Suh-Jenq
Yang,
Chou-Jung Hsu and Dar-Li Yang
(2013). Note on "Unrelated parallel-machine scheduling with
rate-modifying activities to minimize the total completion time". Information Sciences (Accepted) (SCI).
[78]
Dar-Li Yang, Chien-Jung Lai and Suh-Jenq Yang (2013). Scheduling problems
with multiple common due windows assignment and controllable processing
times on a single machine. International Journal of Production Economics
(Accepted) (SCI).
[79] Yung-Tsung Hou, Dar-Li Yang and Wen-Hung
Kuo
(2014). Lot scheduling on a single machine. Information Processing Letters
(Accepted) (SCI).
[80] Dehua Xu, Long Wan, Aihua Liu and Dar-Li Yang
(2014). Single machine total completion time scheduling problem with
workload-dependent maintenance duration. Omega (Accepted)
(SSCI).
[81] Ping-Hung Hsieh, Suh-Jenq Yang and Dar-Li Yang (2015). Decision support
for unrelated parallel-machine scheduling with discrete controllable
processing times. Applied Soft Computing (Accepted) (SCI).
|