| 回資管系 | 連絡方式 | 學歷與經歷 | 校外服務與榮譽

 

期刊論文

[1]  Dar-Li Yang and Maw-Sheng Chern (1995).  A two-machine flowshop sequencing problem with limited waiting time constraints. Computers and Industrial Engineering 28, 63-70 (SCI).

[2]  Maw-Sheng Chern and Dar-Li Yang (1995).  A branch-and-bound algorithm for the two-machine sequencing problem with reprocessing operations. Journal of the Chinese Institute of Industrial Engineers 12, 55-61 (EI).

[3]  Dar-Li Yang and Maw-Sheng Chern (1997).  A scheduling problem with reprocessing operations - a case study. Journal of Management 14, 135-154 (TSSCI).

[4]  Dar-Li Yang, Maw-Sheng Chern and Jung-Te Wang (1998).  A two-machine multi-family flowshop batch processing scheduling problem with the total completion time case. International Journal of Operations and Quantitative Management 4, 315-325.

[5]  Dar-Li Yang and Maw-Sheng Chern (1999).  A generalized two-machine flowshop scheduling problem with processing time linearly dependent on job waiting-time. Computers and Industrial Engineering 36, 365-378 (SCI).

[6]  Dar-Li Yang and Maw-Sheng Chern (2000).  Two-machine flowshop group scheduling problem.  Computers and Operations Research 27, 975-985 (SCI).

[7]  Maw-Sheng Chern, Dar-Li Yang and Jung-Te Wang (2001).  A two-stage multi-family flowshop scheduling problem with two batch processors.  Journal of the Chinese Institute of Industrial Engineers 18, No.3, 77-85 (EI).

[8]  Dar-Li Yang, Maw-Sheng Chern and Jung-Te Wang (2001). A two-machine multi-family flowshop  scheduling problem with batch processing.  International Journal of Industrial Engineering 8, No.4, 289-298 (SCI).

[9]  Dar-Li Yang, Ching-Lien Hung, Chou-Jung Hsu and Maw-Sheng Chern (2002).  Minimizing the makespan in a single machine scheduling problem with a flexible maintenance. Journal of the Chinese Institute of Industrial Engineers 19, No.1, 63-66 (EI).

[10] Chih-Hsiung Wang, Dar-Li Yang, Tai-Hsi Wu, Wen-Hung Kuo and Neng-Hui Shih (2004).  Impact of inspection errors on the lot size problem. Journal of Information and Optimization Science 25, No.2, 331-348 (EI).  

[11] Wen-Hung Kuo and Dar-Li Yang (2006). Single-machine group scheduling with a time-dependent learning effect. Computers and Operations Research 33, No.8, 2099-2112 (SCI).

[12] Wen-Hung Kuo and Dar-Li Yang (2006). Minimizing the total completion time in a single machine scheduling problem with a time-dependent learning effect. European Journal of Operational Research 174, No.2, 1184-1190 (SCI).

[13] Wen-Hung Kuo and Dar-Li Yang (2006). Minimizing the makespan in a single machine scheduling problem with a time-based learning effect. Information Processing Letters 97, No.2, 64-67 (SCI).

[14] Chou-Jung Hsu, Wen-Hung Kuo, Dar-Li Yang and Maw-Sheng Chern (2006). Minmizing the makespan in a two-stage flowshop scheduling problem with a function constraint on alternative machines.  Journal of Marine Science and Technology 14, No.4, 213-217 (SCI).

[15] Wen-Hung Kuo and Dar-Li Yang (2007). Single machine scheduling with past-sequence-dependent setup times and learning effects. Information Processing Letters 102, No.1, 22-26 (SCI).

[16] Wen-Hung Kuo and Dar-Li Yang (2007). Single-machine scheduling problems with start-time dependent processing time. Computers and Mathematics with Applications 53, No.11, 1658-1664 (SCI).

[17] Wen-Hung Kuo and Dar-Li Yang (2007). Single-machine scheduling problems with the time-dependent learning effect. Computers and Mathematics with Applications 53, No.11, 1733-1739 (SCI).

[18] Dar-Li Yang and Wen-Hung Kuo (2007). Single-machine scheduling with an actual time-dependent learning effect. Journal of the Operational Research Society 58, 1348 - 1353 (SSCI).

[19] Dar-Li Yang, Chou-Jung Hsu and Wen-Hung Kuo (2008). A two-machine flowshop scheduling problem with a separated maintenance constraint. Computers and Operations Research 35, No.3, 876-883 (SCI).

[20] Dar-Li Yang, Wen-Hung Kuo and Maw-Sheng Chern (2008). Multi-family scheduling in a two-machine reentrant flow shop with setups. European Journal of Operational Research 187, No.3, 1160-1170 (SCI).

[21] Wen-Hung Kuo and Dar-Li Yang (2008). Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect. Journal of the Operational Research Society 59, 416-420 (SSCI).

[22] Wen-Hung Kuo and Dar-Li Yang (2008). A note on due-date assignment and single machine scheduling with deteriorating jobs. Journal of the Operational Research Society 59, 857- 859 (SSCI).

[23] Wen-Hung Kuo and Dar-Li Yang (2008). Parallel machine scheduling with time dependent processing times. Theoretical Computer Science 393, Issues 1-3, 204-210 (SCI).

[24] Wen-Hung Kuo, Chou-Jung Hsu and Dar-Li Yang (2009). A note on unrelated parallel machine scheduling with time dependent processing times. Journal of the Operational Research Society 60, 431- 434 (SSCI).

[25] Ling-Huey Su, Dar-Li Yang and Hou-Kuan Chou (2009). A two-stage flowshop scheduling with limited buffer storage. Asia-Pacific Journal of Operations Research 26, 503-522 (SCI).

[26] Dar-Li Yang and Wen-Hung Kuo (2009). A single-machine scheduling problem with learning effects in intermittent batch production. Computers and Industrial Engineering 57, 762-765 (SCI).

[27] Dar-Li Yang and Wen-Hung Kuo (2009). Single-machine scheduling with both deterioration and learning effects. Annals of Operations Research 172, 315-327 (SCI).

[28] Dar-Li Yang and Wen-Hung Kuo (2010). Some scheduling problems with deteriorating jobs and learning effects. Computers and Industrial Engineering 58, 25-28 (SCI).

[29] Wen-Hung Kuo and Dar-Li Yang (2010). Viewpoint on Single-machine with a sum-of-actual-processing-time-based learning effect. Journal of the Operational Research Society 61, 352-355 (SSCI).

[30] Suh-Jenq Yang, Dar-Li Yang and T.C.E. Cheng (2010). Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. Computers and Operations Research 37, 1510-1514 (SCI).

[31] Wen-Hung Kuo and Dar-Li Yang (2010). Erratum on machine scheduling with a general learning effect.  Mathematical and Computer Modelling 51, 847-849 (SCI).

[32] Suh-Jenq Yang and Dar-Li Yang (2010). Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities. Omega 38, 528-533 (SSCI).

[33] Suh-Jenq Yang and Dar-Li Yang (2010). Single-machine group scheduling problems under the effects of deterioration and learning. Computers and Industrial Engineering 58, 754-758  (SCI).

[34] Suh-Jenq Yang, Chou-Jung Hsu and Dar-Li Yang (2010). Single-machine scheduling with due-date assignment and aging effect under a deteriorating maintenance activity consideration. International Journal of Information and Management Sciences 21, 177-195 (EI).

[35] Wen-Hung Kuo and Dar-Li Yang (2010). Note on "Single-machine and flowshop scheduling with a general learning effect model" and "Some single-machine and m-machine flowshop scheduling problems with learning considerations". Information Sciences 180, 3814-3816 (SCI).

[36] Suh-Jenq Yang, Chou-Jung Hsu and Dar-Li Yang (2010). Parallel-machine scheduling with setup and removal times under consideration of the learning effect. Journal of the Chinese Institute of Industrial Engineers 27, 372-378 (EI).

[37] Suh-Jenq Yang and Dar-Li Yang (2010). Minimizing total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities.  Computers and Mathematics with Applications 60, 2161-2169 (SCI).

[38] Suh-Jenq Yang and Dar-Li Yang (2010). Note on "A note on single-machine group scheduling problems with position-based learning effect". Applied Mathematical Modelling 34, 4306-4308 (SCI).

[39] Suh-Jenq Yang and Dar-Li Yang (2010). Single-machine scheduling problems with aging effect under an optional maintenance activity consideration. INFOR 48, 171-179 (SCI).

[40] Wen-Hung Kuo and Dar-Li Yang (2011). A note on due date assignment and single-machine scheduling with deteriorating jobs and learning effects. Journal of the Operational Research Society 62, 206-210 (SSCI).

[41] Chou-Jung Hsu, Suh-Jenq Yang and Dar-Li Yang (2011). Due-date assignment and optional maintenance activity scheduling problem with linear deteriorating jobs. Journal of Marine Science and Technology  19, 97-100 (SCI).

[42] Chou-Jung Hsu, Wen-Hung Kuo and Dar-Li Yang (2011). Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects. Applied Mathematical Modelling 35, 1492-1496 (SCI).

[43] Suh-Jenq Yang and Dar-Li Yang (2011). Single-machine scheduling simultaneous with position-based and sum-of-processing-times-based learning considerations under group technology assumption. Applied Mathematical Modelling 35, 2068-2074 (SCI).

[44] Ji-Bo Wang, Dar-Li Yang and Chou-Jung Hsu (2011). Single-machine scheduling to minimize absolute value in maximum lateness with deteriorating jobs. Advanced Materials Research 201-203, 1054-1060 (EI).

[45] T.C.E. Cheng, Chou-Jung Hsu and Dar-Li Yang (2011). Unrelated parallel-machine scheduling with deteriorating maintenance activities. Computers and Industrial Engineering 60, 602-605 (SCI).

[46] Suh-Jenq Yang, Chou-Jung Hsu, Teng-Ruey Chang and Dar-Li Yang (2011). Single-machine scheduling with past-sequence-dependent delivery times and learning effect. Journal of the Chinese Institute of Industrial Engineers 28, 247-255 (EI).

[47] Chou-Jung Hsu, Suh-Jenq Yang and Dar-Li Yang (2011). Two due date assignment problems with position-dependent processing time on a single-machine. Computers and Industrial Engineering 60, 796-800 (SCI).

[48] Wen-Hung Kuo, Chou-Jung Hsu and Dar-Li Yang (2011). Some unrelated parallel machine scheduling problems with past-sequence-dependent setup time and learning effects. Computers and Industrial Engineering 61, 179-183 (SCI).

[49] Chuan-Li Zhao, Chou-Jung Hsu and Dar-Li Yang (2011). Considerations of single-machine scheduling with deteriorating jobs. Applied Mathematical Modelling 35, 5134-5142 (SCI).

[50] Chou-Jung Hsu, T.C.E. Cheng  and Dar-Li Yang (2011). Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time. Information Sciences 181, 4799-4803 (SCI).

[51] Dar-Li Yang and Wen-Hung Kuo (2011). Scheduling with deteriorating jobs and learning effects. Applied Mathematics and Computation 218, 2069-2073 (SCI).

[52] Suh-Jenq Yang, Dar-Li Yang and Teng-Ruey Chang (2011). Single-machine scheduling with joint deterioration and learning effects under group technology and group availability assumptions. Journal of the Chinese Institute of Industrial Engineers 28, 597-605 (EI).

[53] Suh-Jenq Yang and Dar-Li Yang (2012). Single-machine scheduling problems simultaneous with deteriorating and learning effects under a deteriorating maintenance consideration.  A chapter in the book Just-in-Time Systems Roger Z. Ríos-Mercado and Yasmín A. Ríos-Solís, editors. Volume 60 of  Series on Optimization and Its Applications. Springer, 1st edition.

[54] Wen-Hung Kuo and Dar-Li Yang (2012). Single-machine scheduling with deteriorating jobsInternational Journal of Systems Science 43, 132-139 (SCI).

[55] T.C.E. Cheng, Suh-Jenq Yang and Dar-Li Yang (2012). Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. International Journal of Production Economics 135, 154-161 (SCI).

[56] Suh-Jenq Yang, Chou-Jung Hsu and Dar-Li Yang (2012). Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance. Optimization Letters 6, 1855-1873 (SCI).

[57] Wen-Hung Kuo, Chou-Jung Hsu and Dar-Li Yang (2012). Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent leaning effect. Information Sciences 184, 282-297 (SCI).

[58] Dar-Li Yang, T.C.E. Cheng, Suh-Jenq Yang and Chou-Jung Hsu (2012). Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities. Computers and Operations Research 39, 1458-1464 (SCI).

[59] Suh-Jenq Yang and Dar-Li Yang (2012). Single-machine scheduling problems with past-sequence-dependent delivery times and position-dependent processing times. Journal of the Operational Research Society 63, 1508-1515 (SSCI).

[60] Suh-Jenq Yang, Chou-Jung Hsu and Dar-Li Yang (2012). Note on "Unrelated parallel-machine scheduling with deteriorating maintenance activities". Computers and Industrial Engineering 62, 1141-1143 (SCI).
[61] Wen-Hung Kuo and Dar-Li Yang (2012). A short note on "Proportionate flowshops with general position-dependent processing times". Information Processing Letters 112, 479-480 (SCI).

[62] Suh-Jenq Yang and Dar-Li Yang (2013). Note on "A unique integer mathematical model for scheduling deteriorating jobs with rate-modifying activities on a single machine".  International Journal of Advanced Manufacturing Technology 64, 1759-1764 (SCI).

[63] Dar-Li Yang, Hsin-Tao Lee and Suh-Jenq Yang (2012). Unrelated parallel-machine scheduling simultaneously with rate-modifying activities and earliness and tardiness penalties. Journal of the Chinese Institute of Industrial Engineers 29, 282-289 (EI).

[64] Min Ji, Chou-Jung Hsu and Dar-Li Yang (2013). Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration. Journal of Combinatorial Optimization 26, 437-447 (SCI).

[65] Ji-Bo Wang, Chou-Jung Hsu and Dar-Li Yang (2013). Single-machine scheduling with effects of exponential learning and general deterioration. Applied Mathematical Modelling 37, 2293-2299 (SCI).

[66] Hsin-Tao Lee, Dar-Li Yang and Suh-Jenq Yang (2013). Multi-machine scheduling with deterioration effects and maintenance activities for minimizing the total earliness and tardiness costs.  International Journal of Advanced Manufacturing Technology 66, 547-554 (SCI).

[67] T.C.E. Cheng, Wen-Hung Kuo and Dar-Li Yang (2013). Scheduling with a position-weighted learning effect based on sum-of-logarithm-processing-times and job position. Information Sciences 221, 490-500 (SCI).

[68] Dar-Li Yang, T.C.E. Cheng and Wen-Hung Kuo (2013). Scheduling with a general learning effect. International Journal of Advanced Manufacturing Technology 67, 217-229 (SCI).

[69] Dar-Li Yang and Suh-Jenq Yang (2013). Unrelated parallel-machine scheduling problems with multiple rate-modifying activities.  Information Sciences 235, 280-286 (SCI).

[70] Suh-Jenq Yang, Jia-Yuarn Guo, Hsin-Tao Lee and Dar-Li Yang (2013). Single-machine scheduling problems with past-sequence-dependent delivery times and deterioration and learning effects simultaneously. International Journal of Innovative Computing Information and Control 9, 3981-3989.

[71] Dehua Xu and Dar-Li Yang (2013). Makespan minimization for two parallel machines scheduling with a periodic availability constraint: Mathematical programming model, average-case analysis, and anomalies. Applied Mathematical Modelling 37, 7561-7567 (SCI).

[72] Chou-Jung Hsu, Min Ji, Jia-Yuarn Guo and Dar-Li Yang (2013). Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities .  Information Sciences 253, 163-169 (SCI).

[73] Chou-Jung Hsu and Dar-Li Yang (2014). Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time. Optimization Letters 8, 519-531 (SCI).

[74] T.C.E. Cheng, Wen-Hung Kuo and Dar-Li Yang (2014). Scheduling with a position-weighted learning effect. Optimization Letters 8, 293-306 (SCI).

[75] Dehua Xu, Aihua Liu and Dar-Li Yang (2014). Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities. The Arabian Journal for Science and Engineering 39, 3715-3722 (SCI).

[76] Dar-Li Yang, T.C.E. Cheng and Suh-Jenq Yang (2014). Parallel-machine scheduling with controllable processing times and rate-modifying activities to minimize total cost involving total completion time and job compressions. International Journal of Production Research 52, 1133-1141 (SCI).

[77] Suh-Jenq Yang, Chou-Jung Hsu and Dar-Li Yang (2014).  Note on "Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time".  Information Sciences 260, 215-217 (SCI).

[78] Dar-Li Yang, Chien-Jung Lai and Suh-Jenq Yang (2014). Scheduling problems with multiple common due windows assignment and controllable processing times on a single machine. International Journal of Production Economics 150, 96-103 (SCI).

[79] Yung-Tsung Hou, Dar-Li Yang and Wen-Hung Kuo (2014). Lot scheduling on a single machine. Information Processing Letters 114, 718-722 (SCI).

[80] Teng-Ruey Chang, Hsin-Tao Lee, Dar-Li Yang and Suh-Jenq Yang (2014). Single-machine scheduling problems with past-sequence-dependent delivery times and deterioration and learning effects simultaneously. International Journal of Innovative Computing Information and Control 10, 1587-1600.

[81] Dehua Xu, Long Wan, Aihua Liu and Dar-Li Yang (2015). Single machine total completion time scheduling problem with workload-dependent maintenance duration. Omega 52, 101-106 (SSCI).

[82] Ping-Hung Hsieh, Suh-Jenq Yang and Dar-Li Yang (2015). Decision support for unrelated parallel-machine scheduling with discrete controllable processing times.  Applied Soft Computing 30, 475-483 (SCI).

[83] Dar-Li Yang, Yung-Tsung Hou and Wen-Hung Kuo (2017). A note on a single-machine lot scheduling problem with indivisible orders. Computers and Operations Research 79, 34-38 (SCI).

[84] Xianyu Yu, Dar-Li Yang, Dequn Zhou and Peng Zhou (2018). Multi-machine scheduling with interval constrained position-dependent processing times. Journal of Industrial and Management Optimization 14, 803-815 (SCI).

[85] Yung-Tseng Hou, Dar-Li Yang, Wen-Hung Kuo and Li-Shing Wu (2018). A single-machine scheduling problem with a deterioration model and partial maintenance. Journal of Statistics and Management Systems 21, 1501-1511 (EI).

[86] Dar-Li Yang and Wen-Hung Kuo (2019). Minimizing Makespan in A Two-Machine Flowshop Problem with Processing Time Linearly Dependent on Job Waiting Time. Sustainability (This article belongs to the Special Issue Scheduling Problems in Sustainability) 11, 6885(18 pages) (SCI).

 

研討會論文

[1]  Maw-Sheng Chern and Dar-Li Yang (1992).  A two-machine scheduling problem with reprocessing operations. The 5th International Congress on Computational and Applied Mathematics, Belgium.

[2]  Maw-Sheng Chern and Dar-Li Yang (1992).  A two-machine multi-batch scheduling problem with reprocessing operations and significant setup times. The 2th International Conference on Automation Technology, Vol. 4, 53-59, Taipei.

[3]  Maw-Sheng Chern and Dar-Li Yang (1992).  A two-machine multi-batch scheduling problem with reprocessing operations. Proceedings of CIIE Conference, 31-36, Kaosiung.

[4]  Maw-Sheng Chern and Dar-Li Yang (1994).  On the computertational complexity of two-machine flowshop scheduling problem with transportation times. Proceedings of the Asia-Pacific IE Conference and 1994 CIIE Conference, 397-402, Tainan.

[5]  Maw-Sheng Chern and Dar-Li Yang (1995).  A branch-and-bound algorithm for the two-machine multi-batch scheduling problem with reprocessing operations, 1995 TIMS Conference, Singapore.

[6]  Maw-Sheng Chern and Dar-Li Yang (1995).  On the computertational complexity of two-machine flowshop scheduling problem with the processing time linearly dependent on job waiting time. 1995 International Conference of Computers and Industrial Engineering, Shanghai.

[7]  Dar-Li Yang and Maw-Sheng Chern (1996).  A generalized two-machine flowshop scheduling problem with processing time linearly dependent on job waiting-time. Proceedings of the CIIE Conference, 381-390, Taipei.

[8]  Dar-Li Yang and Maw-Sheng Chern (1997).  A flowshop batch processing scheduling problem with non-identical job sizes (I). Proceedings of the CIIE Conference, 65-70, Kaosiung.

[9]  Dar-Li Yang and Maw-Sheng Chern (1997).  A flowshop batch processing scheduling problem with non-identical job sizes (II). Proceedings of the CIIE Conference, 36-39, Kaosiung.

[10]  Dar-Li Yang (1998).  Two-stage no-wait flowshop scheduling with a common first stage machine. Joint Conference of The 5th International Conference on Automation Technology and 1998 International Conference of Production Research (Asia Meeting), A6-5, Taipei.

[11]  Dar-Li Yang, Maw-Sheng Chern and Jung-Te Wang (1998).  A two-machine multi-family flowshop batch processing scheduling problem with the total completion time case. Proceedings of the Quantitative Management Techniques and Applications in Taiwan Conference, 385-396, Tainan.

[12]  Dar-Li Yang and Maw-Sheng Chern (1998).  A two-machine flowshop scheduling problem with an avaibability constraint. Proceedings of CIIE Conference, 129-134, Changhua.

[13]  Dar-Li Yang (1999).  A two-machine flowshop scheduling problem with a separated adjustable time constraint. Proceedings of the 1999 Conference on Production Scheduling: Theory and Its Applications, B1-5, Hsinchu.

[14]  Dar-Li Yang (1999).  A worst case bound analysis for the single machine scheduling problem with an avaibability constraint. Proceedings of the 1999 Conference on Production Scheduling: Theory and Its Applications, B6-6, Hsinchu.

[15]  Maw-Sheng Chern, Tse-Wei Yu and Dar-Li Yang (1999).  A two-stage multi-family flowshop scheduling problem with a common machine. Proceedings of the 1999 Conference on Production Scheduling: Theory and Its Applications, B12-17, Hsinchu.

[16]  Dar-Li Yang (2000).  Minimizing the makespan in a two-machine flowshop scheduling with a flexible maintenance.  Proceedings of the 5th Annual International Conference on Industrial Engineering - Theory, Applications and Practice, ID131, Hsinchu.

[17]  Dar-Li Yang, Ching-Lien Hung, Chou-Jung Hsu and Maw-Sheng Chern (2000).  Minimizing the makespan in a single machine scheduling problem with a flexible maintenance.  Proceedings of the 5th Annual International Conference on Industrial Engineering - Theory, Applications and Practice, ID132, Hsinchu.

[18]  Wen-Hung Kuo and Dar-Li Yang (2000).  A study of the makespan in a two-machine flow shop scheduling system with a flexible maintenance.  Proceedings of the 5th Annual International Conference on Industrial Engineering - Theory, Applications and Practice, ID326, Hsinchu.

[19]  Dar-Li Yang, Chou-Jung Hsu, Ching-Lien Hung and Maw-Sheng Chern (2001).  Minimizing the makespan in a two-machine  flowshop scheduling problem with proceedings time linearly dependent on job waiting-time Proceedings of CIIE Conference, ID-ciie2001-0061, Kaosiung

[20]  Dar-Li Yang, Chou-Jung Hsu, Ching-Lien Hung and Maw-Sheng Chern (2003).  Minimizing the makespan in a single machine scheduling with flexible maintenance and learning effect.  Proceedings of CIIE Conference, ID-ciie-2003-239, Changhua.

[21]   Chou-Jung Hsu, Ching-Lien Hung, Dar-Li Yang and Maw-Sheng Chern (2003).  Minimizing the makespan in a single machine scheduling problem with two maintenance stratagems.  Proceedings of CIIE Conference, ID-ciie-2003-173, Changhua.

[22]  Chou-Jung Hsu, Wen-Hung Kuo, Dar-Li Yang and Maw-Sheng Chern (2004). Minmizing the makespan in a two-stage flowshop scheduling problem with alternative machines. Proceedings of CIIE Conference, Tainan.

[23] Wen-Hung Kuo and Dar-Li Yang( 2004). Single machine group scheduling problem with a time-dependent learning effect. Proceedings of CIIE Conference, Tainan.

[24]  呂孟凌, 沈佩汶, 林苑婷, 林敬貞, 張金玉, 張雅婷, 楊達立 (2004). 股價指數與黃金價格變動之研究與探討. 2004年國際資訊管理暨電子商務經營管理研討會, 嘉義.

[25] Dar-Li Yang, Wen-Hung Kuo and Maw-Sheng Chern (2005). Minimizing the makespan in single-machine scheduling with a general time-dependent learning effect. 第三屆流通與全球運籌論文研討會, 台中.

[26] 羅貴魁, 鄭印良, 楊達立 (2006). 漸進式多重最小支持度關聯規則之維護. ICIM2006國際資訊管理學術研討會, 高雄.

[27] Wen-Hung Kuo and Dar-Li Yang (2006). Minimizing the makespan on uniform parallel machines with a function constraint in a two-stage flowshop scheduling problem. 中國工業工程學會95年度年會暨學術研討會, 台中.

[28] 楊達立, 蔡仁皓 (2006). 雙機流線型批次排程問題探討. 中國工業工程學會95年度年會暨學術研討會, 台中.

[29] 鄭印良, 羅貴魁, 楊達立 (2006). 以利潤為主要考量之多重最小支持度關聯規則. 中國工業工程學會95年度年會暨學術研討會, 台中.

[30] 羅貴魁, 楊達立 (2006). 漸進式資料探勘之關聯規則維護. 第十二屆資訊管理暨實務研討會, 雲林.

[31] 鄭印良, 羅貴魁, 楊達立 (2006). 以利潤為主要考量之多重最小支持度關聯規則維護. 第十二屆資訊管理暨實務研討會, 雲林.

[32] 康聖祥, 羅貴魁, 楊達立 (2007). 以利潤為主要考量之多重最小支持度量化關聯規則. TANET 2007台灣網際網路研討會, 台北.

[33] 羅貴魁, 楊達立 (2007). 多支持度階層類別模糊關聯規則之應用. 第十三屆資訊管理暨實務研討會, 高雄.

[34] 羅貴魁, 楊婉祺, 楊達立 (2008). 限制條件下之多支持度階層類別模糊關聯規則之應用. 2008ERP學術與實務研討會, 桃園.

[35] 楊婉琪, 康聖祥, 羅貴魁, 楊達立 (2008). 模糊階層關聯規則之應用-利用FP-tree 相似結構. EITS2008第三屆數位教學暨資訊實務研討會, 台南.

[36] Dar-Li Yang and Wen-Hung Kuo (2008). Single-machine scheduling with learning effects in intermittent batch production. The 19th annual conference of the Production and Operations Management Society (POMS), California, U.S.A.

[37] Suh-Jenq Yang, Cheng-Chih Yang, Dar-Li Yang and Chou-Jung Hsu (2009). Decision support for optimal scheduling problem of due-date assignment and aging effect under a maintenance activity consideration. ICIM2009 第二十屆國際資訊管理學術研討會, 1594-1603, 台北.

[38] Wen-Hung Kuo and Dar-Li Yang (2009). A single-machine makespan minimization scheduling problem with a general learning effect. 2009 CORS/INFORMS International Conference, Toronto, Canada.

[39] Chou-Jung Hsu, Jia-Yuarn Guo, Fang-Pin Chuang and Dar-Li Yang (2009). Single-machine scheduling problems with setup and removal time under job-dependent learning considerations. 中國工業工程學會98年度年會暨學術研討會, 台中.

[40] Suh-Jenq Yang,  Chou-Jung Hsu and Dar-Li Yang (2009). Parallel-machine scheduling with job-dependent aging effects and maintenance activities. 中國工業工程學會98年度年會暨學術研討會, 台中.

[41] T.C.E. Cheng, Wen-Hung Kuo and Dar-Li Yang (2009). Single-machine scheduling problems with a position-weighted learning effect based on sum-of-logarithm-processing times and job position. 中國工業工程學會98年度年會暨學術研討會, 台中.

[42] Wen-Hung Kuo, Chou-Jung Hsu and Dar-Li Yang (2010). An unrelated parallel machine scheduling problem simultaneously with learning effect and past-sequence-dependent setup time. The 40th International Conference on Computers & Industrial Engineering, Hyogo, Japan.

[43] Wen-Hung Kuo and Dar-Li Yang (2013). Minimizing the makespan on single-machine scheduling with deterioration effect and partial machine maintenance. The 26th EURO-INFORMS Joint International Conference on Operational Research, Rome, Italy.

[44] Wen-Hung Kuo, Yung-Tsung Hou and Dar-Li Yang (2014). A lot Scheduling problem with divisible orders. 2014 International Conference on Business and Information, Osaka, Japan.

 

技術報告及其他

[1]  Dar-Li Yang (1998).  A study on batch processing machine scheduling problems (I), NSC 87-2213-E252-001.

[2]  Dar-Li Yang (1999).  A study on batch processing machine scheduling problems (II), NSC 88-2213-E252-001. 

[3]  Dar-Li Yang (2000).  Some scheduling problems with machines availability constraints, NSC 89-2213-E252-002.

[4]  Dar-Li Yang (2001).  Some scheduling problems with machines availability constraints  (II), NSC 89-2213-E252-010.

[5]  Dar-Li Yang (2002).  Some scheduling problems with different maintenance stratagems (I), NSC 90-2218-E252-002.

[6]  許聰鑫、楊達立 (2002).  製商整合資源中心-AMS 之建置, 教育部顧問室

[7]  Dar-Li Yang (2003).  Some scheduling problems with different maintenance stratagems (II), NSC 91-2213-E150-027.

[8]  Dar-Li Yang (2004).  具有替代式機台之二階段流線型排程問題研究 (I), NSC 92-2213-E150-017. 

[9]   楊達立 (2004).  協同式產品開發暨製商整合實務教學平台構建-以精密機械產業為對象, 教育部顧問室.

[10] 楊達立 (2005).  製商整合科技人才培育-精密機械產業產品開發製商整合學程 , 教育部顧問室.

[11] 楊達立 (2005).  具有學習效果之排程問題研究(I), NSC 93-2213-E150-019.

[12] 楊達立 (2006).  具有學習效果之排程問題研究(II), NSC 94-2213-E150-016.

[13] 楊達立、蔡明標 (2006). 精密機械產業之製商整合科技人才培育, 教育部顧問室.

[14] 楊達立 (2007). 工作處理時間與開始加工時間相關之平行機台排程問題研究, NSC 95-2221-E150-050.

[15] 楊達立 (2008). 具有循環退化效果之單機排程問題研究, NSC 96-2221-E150-059.

[16] 楊達立 (2009-2010). 同時具有退化與學習效應之單機排程問題研究, NSC 97-2221-E150-056-MY2.

[17] 楊達立 (2011-2012). 具有維修作業之平行機台排程問題研究, NSC 99-2221-E-150-034-MY2.

[18] 楊達立 (2013). 具有維修作業與資源配置之平行機排程問題研究(I), NSC 101-2221-E-150-053.

[19] 楊達立 (2014). 具有維修作業與資源配置之平行機排程問題研究(II), NSC 102-2221-E-150-042.

[20] 楊達立 (2015). 具有離散資源配置之非等效平行機台排程問題研究, NSC 103-2221-E-150 -028.